Client:
Vasgold LLC
Location:
Kazakhstan
Completion Date:
2012
Plant Capacity:
10.000.000 ton / year
Scope:
EP (ADR Unit) + Construction Supervision
Process:
Tank Leach
Ore Type:
Gold & Silver
Scope Details
- Basic Engineering
- Detailed Engineering
- ADR Equipment Supply & Logistics
- Construction Supervision